As of Wednesday, July 6, 2022, the Spences Bridge Transfer Station will be returning to its former location, at 9549 Highway 8, and will resume normal hours: Wednesdays and Sundays, 8 am to 4 pm.
Access to the Transfer Station is being made possible due to the reopening of a two-kilometre section of Highway 8, which will reopen at 8 am on Wednesday, July 6, 2022. This section of road will look different than it used to. Please obey all traffic control and use caution through the area.
For a list of acceptable materials at this Transfer Station, please visit: www.tnrd.ca/facility/spences-bridge-transfer-station/.